Highway 23 in Milaca MnDOT Survey ends March 31st

Highway 23 in Milaca MnDOT Survey ends March 31st

March 30, 2021 News News -- KKIN-KFGI-KLKS-WWWI 0

By Paul Vold kkinradio@embarqmail.com (3/30/21)

(Milaca, MN) — March 31st is the final day for those who drive, ride, walk, or do business on Highway 23 in Milaca to take an online survey and watch a presentation for a 2021 transportation study from the Minnesota Department of Transportation.

MnDOT, working with Mille Lacs County and the city of Milaca, is conducting a corridor study to identify traffic flow needs, safety improvements and multimodal use. This study will be used to coordinate a future project in 2025-26 where MnDOT will improve Highway 23 from the Rum River Bridge at Fifth Street SW to Mille Lacs County Road 2 in Milaca.

The presentation explains key highlights of the Highway 23 corridor, Project information, and contact information for Project manager Zachary Whitley (Call 320-293-9411 or email) can be found with this story at rjbroadcasting.com.